Read the land before you draw the house.
A pretty view does not tell you about access, boundaries, water or the questions a site visit cannot answer. Start there, before anyone draws a house.
Read the field noteNotes on the decisions that shape a house, from buying land to the handover. Filter by stage or region, or search for a word.

27 guides
A pretty view does not tell you about access, boundaries, water or the questions a site visit cannot answer. Start there, before anyone draws a house.
Read the field noteIn Mauritius the permit comes first. Here is how to find the current rules for your site, without guessed fees or invented timelines.
Read the field noteShade and a route for air do more for comfort than a bigger air conditioner. Start with the shape of the house and the sun it actually receives.
Read the field noteWater gets in at the detail you forgot: a balcony edge, a window sill, a drain that goes nowhere. A waterproofing product is not a design.
Read the field noteCyclone design is an engineer’s job. These are the questions a homeowner can still ask, without pretending to have designed the roof.
Read the field noteThe lowest number often leaves the most out. Compare scope, assumptions and who is responsible, then look at the price.
Read the field noteOnce the plaster is on, you are trusting a photograph and a memory. Agree what will be inspected, and when, before the work is covered.
Read the field noteKeys are not a handover. You need the records, a walk-through that works, and a written list of what is still outstanding.
Read the field noteWalking the plot is not a title search. Ask how the deed, the cadastre and any morcellement conditions fit together before you treat the land as ready to buy.
Read the field noteIn a warm, humid climate, moisture and timber-destroying insects are everyday risks. They belong in the drawings and the inspections, not in a last-minute spray.
Read the field noteSolar panels and water tanks change the load on a roof, the drainage and, often, the approvals you need. Ask that before anyone orders the kit.
Read the field noteThe covering, the shape, the fixings, the eaves and anything added later belong in one conversation with a structural professional. A strong-looking sheet is not a roof design.
Read the field noteSetback, erosion and exposure are specific to this parcel, not to a beach you liked in a photograph. Confirm the current rules for this exact site.
Read the field noteA house designed for a photograph from somewhere else often fails in this climate. Start with the heat, the rain, the wind and the sun on this plot.
Read the field noteThe wall that keeps a cold house warm can trap moisture in a humid one. Ask how heat, air and moisture are meant to move, and where they must not.
Read the field noteClay, sand, rock, peat and filled ground do not carry a house in the same way. A foundation that works on one plot can be the wrong choice a street away.
Read the field noteSomeone has to say yes before work starts. The authority and the form change from place to place; the need to get the current rules in writing does not.
Read the field noteGive every bidder the same drawings and the same scope, then compare who is actually responsible on site. A low number is not a complete offer.
Read the field noteRenovation budgets usually break in the first week of demolition. Old paint, old wiring and old damp are cheaper to find with a survey than with a crowbar.
Read the field noteA hillside plot is a drainage, access and stability problem before it is a panorama. Ask where the water will go, and who has designed the ground, before anyone cuts the slope.
Read the field noteSewer or septic tank and absorption pit? In Mauritius the answer depends on the WMA, the soil and the size of the plot, and it is far cheaper to settle on paper than after the slab is cast.
Read the field noteSolar panels, batteries and heat pumps are all sized against how much energy the house needs. That number is set much earlier, by the plan, the glass, the insulation and the gaps. Get those right first.
Read the field noteMauritius’s drainage authority lists new building among the causes of its floods. Where your rain can lawfully go, what you owe the neighbours and when a drainage assessment is required, settled before the plan is fixed.
Read the field noteMost building contracts hide a few figures that are guesses: allowances for taps and tiles, a sum for digging, a price that moves when the plans do. Here is how consumer regulators tell owners to spot them, and what a contingency is really for.
Read the field noteA CEB connection for a new house in Mauritius runs on two clocks: one if the network already reaches your plot, a much longer one if it does not. The documents, the inspections, the meter cabin and the fees at the counter, in the order they come up.
Read the field noteFrame colour and style are the easy decisions. How much heat a window leaks, how much sun it lets in and how well it is fitted decide whether a room is comfortable. What U-factor, SHGC and the smaller ratings mean, and why the same window can carry two very different numbers.
Read the field noteA new CWA supply in Mauritius is a form, two site plans and a title deed, then a written price from the Authority. What the regulations say about the meter chamber, the pipe you own, the pump and the tank, and what the bills will look like.
Read the field noteNo guides match. Try a broader word or choose All guides.